Chaoyang District, Beijing
2025-03-24
Diameter/Material/Year
DN400/Steel Pipe / 2010 Years
Check length
7 meters
Key Findings
Leak at 2; approximately 3.7m of seam leakage is clearly visible.
Detection Suggestions:

Excavate immediately to locate and repair the leak.

Project Overview

Detected 2 leak point(s). Notable water seepage observed at the joint around 3.7m. Recommend excavating promptly to confirm and repair the leak to prevent further damage.

Real Photos

Case 5 Image 1

Diagram of Detection Location

Case 5 Image 2

Leak at 3.7 meters

Case 5 Image 3

Leak at 5.78 meters